Roofing SpecialistMalaysia Free inspection

PU Foam Metal Deck Roof in Bukit Mertajam

Many homes in Bukit Mertajam still have original tiles or bare zinc over kitchens and porches. A PU metal deck roof keeps the space cooler and quieter in heavy rain. Our CIDB-registered installation partner covers Bukit Mertajam and the rest of Penang, with free inspection and an on-the-spot quotation, usually within 1 to 3 working days.

Book a free inspection
PU Foam Metal Deck Roof in Bukit Mertajam
Bukit Mertajam
Owners in Bukit Mertajam often replace hot zinc extensions with PU-foam insulated metal deck.

Common roof problems in Bukit Mertajam

  • Termites damage timber trusses in older terraces.
  • Rusted valley gutters overflow into ceilings during storms.
  • Flat porches and extensions pond and leak at joints.

Neighbourhoods we serve in Bukit Mertajam

Alma, Bandar Perda, Machang Bubok, Bukit Minyak, Juru, Permatang Pauh, Berapit, Simpang Ampat

Signs it is time to change to a metal deck roof

  • Old concrete or clay tiles leaking in several places, with broken tiles every time someone goes up
  • Rusted zinc sheets, loose screws and leaks along the sheet laps
  • A back kitchen, porch or extension that is too hot or too noisy under bare zinc
  • Sagging or termite-damaged timber trusses that would benefit from a lighter roof
  • Repeated leaks at valleys and ridges that patch jobs no longer hold

How we install a PU metal deck roof

A metal deck re-roof is a structured job, and the sequence matters for a dry, long-lasting result.

  • Inspection and measurement, including a check of the truss and battens
  • Truss repair or strengthening if needed, quoted separately after a structural check
  • Removal of old tiles or sheets, protecting the ceiling and the home below
  • Installation of PU foam metal deck sheets with correct overlaps and fixings
  • New ridge, flashing and gutter connections, sealed at the party wall or parapet
  • Clean-up, final check and handover with the 10-year warranty
Bukit Mertajam

Indicative prices (2026)

JobPrice rangeWarranty
PU-foam insulated metal deck roof (replace tiles)RM14 – RM22 per sq ft (excl. truss)10 years
Roof truss strengthening / replacementQuoted after inspection (structural check)—
Pitched roof over 30 degreesAdd about 15%—
Roof inspection + on-the-spot quotationFREE (remote areas RM150)—

Indicative ranges in Malaysia. The exact price is confirmed after the free inspection (roof design, pitch, access and damage).

What happens after you book

  1. Tell us the problem

    Tell us the problem

    Send your address and a few photos. Tell us if it leaks only when it rains or also when it is dry.

  2. Free inspection

    Free inspection

    A technician visits within 1–3 working days, water-tests and checks the roof, and shows you the cause.

  3. Quotation on the spot

    Quotation on the spot

    A clear written quotation. No obligation. Deposit only when you confirm.

  4. Works + warranty

    Works + warranty

    Our site team completes the job and you receive a written workmanship warranty.

Frequently asked questions

How much is a PU metal deck roof in Bukit Mertajam?

The indicative price in Bukit Mertajam is RM14 to RM22 per sq ft, excluding truss work, with a 10-year warranty. Your exact Bukit Mertajam quote is confirmed after the free inspection.

Can you install a metal deck roof on a terrace house in Bukit Mertajam?

Yes. Terrace re-roofs are common in Bukit Mertajam. Our technician also checks the junction with your neighbour's roof and the party wall flashing.

How soon can you inspect my roof in Bukit Mertajam?

Most Bukit Mertajam addresses get a free inspection slot within 1 to 3 working days. Book online and we will confirm the nearest site team for Bukit Mertajam.

Do you cover Alma, Bandar Perda and Machang Bubok?

Yes. Our north team covers Bukit Mertajam, including Alma, Bandar Perda, Machang Bubok, Bukit Minyak, Juru, Permatang Pauh, Berapit and Simpang Ampat. The roof inspection and on-the-spot quotation are free for homes. Book online with your address and photos, and we will confirm a slot.

How fast can a roofer come to Bukit Mertajam?

Free inspections in Bukit Mertajam are usually arranged within 1–3 working days. During storm-heavy months, book early as demand rises. Photos or videos of the leak and ceiling help our technician prepare and give an accurate quotation on the day.

How much does a metal deck roof cost in Malaysia?

A PU foam insulated metal deck roof costs about RM14 to RM22 per sq ft in 2026, excluding truss work, with a 10-year warranty. For a 1,400 sq ft terrace roof, that is roughly RM19,600 to RM30,800 before any truss repairs. The exact price is confirmed after our free inspection based on pitch, access and roof design.

Is a metal roof hot in Malaysia?

A bare zinc or metal roof without insulation does get very hot under the Malaysian sun. A PU foam metal deck roof has a foam and aluminium foil layer bonded underneath, which reduces the heat passing into the roof space. Many homeowners also add roof ventilators to push hot air out of the roof void.

Is a metal deck roof noisy when it rains?

Plain metal sheets are noisy in heavy rain. The PU foam layer on an insulated metal deck roof dampens much of that drumming, which is why it is popular for houses, kitchens and porches. It will not be completely silent in a tropical downpour, but it is far quieter than bare zinc.

Book free inspection

Inspection + quotation 100% free in coverage areas. Mon–Fri 8:30am–5:30pm · Sat 8:30am–1pm · online booking 24/7.

Book a free inspection
Inspection + quotation 100% free in coverage areasFree inspection